25th May 2014 Work Party

dynamic - By fosh_admin on Sunday, May 25, 2014 - 18:42

Friends,
Thanks all who came to today’s work party. We achieved a lot as follows:
Path maintenance: Phil, Chrissie and Mark, in the main, repaired the path edging.
Whip maintenance: Mike, Zdena, Mel and Michael checked the whips, which are doing well, before helping with the path edging.
Litter clearing and bike hump removal. Harry, Liam, Neil and I buried most of the broken glass and found a couple of bags of other litter before we made a start at removing the bike humps before Harry, Liam and Neil helped with the path edging and I blocked the cross over path.
by Bill Logan
Tags: dynamic